Skip to content

Track time. Get paid.

Invoice description examples

Turn your working notes into an invoice line your client can recognise. Start with the example closest to your work.

Bring your time record, the completed deliverable and your billing agreement. Find these in your timesheet, delivery email and accepted quote.

Keep the task and completion status accurate. Put quantities and rates in their invoice fields. Remove private comments, passwords and internal discussions.

Search the published examples only. Keep client notes in your own records; this page does not rewrite or upload them.

Download all examples (TXT)

Free, without signup. Open the text file in any text editor and adapt the wording there.

Example: turn 90 minutes into a clear charge

DEV-01 records a checkout postcode validation fix and checkout testing on 4 November 2026, under ticket WEB-42.

Copy: “Checkout postcode validation fix and checkout testing — WEB-42, 4 November 2026.”

Enter 1.5 hours at your agreed USD 100/hour: USD 150 before tax. Keep the original 90-minute record; do not round it to two hours.

Complication: the note only says “more amends”

DES-03 lacks a file, duration and approval reference. Hold the charge and ask: “Which file changed, what was completed, and is this within the agreed fee or approved extra work?”

After checking the records, draft only the confirmed work. Clearer wording cannot prove completion or permission to bill.

Try Development, Design, Consulting, Field visits, retainer or missing.

Show all

12 of 12 examples

Example · Development · DEV-01

Checkout bug fix

Source note
4 November 2026; checkout ticket WEB-42; fixed postcode validation; tested checkout; 90 minutes.
Description to adapt
Checkout postcode validation fix and checkout testing — WEB-42, 4 November 2026.
Quantity or billing basis
1.5 hours
Check before billing
Use after checking the ticket and recorded time. Keep deployment claims out: the note only confirms testing.

Example · Development · DEV-02

Unfinished integration

Source note
5 November 2026; CRM sync investigation; 2 hours; no fix yet.
Description to adapt
CRM sync investigation — 5 November 2026.
Quantity or billing basis
2 hours
Check before billing
Check your agreement before billing investigation. Do not describe this as a completed integration.

Example · Development · DEV-03

Separate approved extra work

Source note
6 November 2026; export CSV feature; change CR-08 approved; built and tested; 3 hours.
Description to adapt
CSV export feature: build and testing — approved change CR-08, 6 November 2026.
Quantity or billing basis
3 hours
Check before billing
Keep this separate from the original fixed fee. Check CR-08 has not already been invoiced.

Example · Design · DES-01

Homepage revision

Source note
4 November 2026; Northstar homepage; revised header and mobile layout; supplied review PDF; 2 hours.
Description to adapt
Northstar homepage: header and mobile layout revisions; review PDF supplied — 4 November 2026.
Quantity or billing basis
2 hours
Check before billing
Match the reviewed version to your records. Supplied for review does not mean client approval.

Example · Design · DES-02

Fixed deliverable

Source note
5 November 2026; logo concept round 1; three concepts delivered; agreed milestone M1.
Description to adapt
Logo concept round 1: three concepts delivered — milestone M1, 5 November 2026.
Quantity or billing basis
1 milestone
Check before billing
Use the agreed milestone fee. Do not convert this to hourly billing or claim final artwork was delivered.

Example · Design · DES-03

Missing revision evidence

Source note
6 November 2026; more amends; no file, duration or approval reference recorded.
Hold this charge
Hold: confirm the revised file, work completed and billing basis before drafting a charge.
Quantity or billing basis
Unknown
Check before billing
Ask: Which file changed, what was completed, and is this within the agreed fee or approved extra work? Do not invent hours.

Example · Consulting · CON-01

Workshop and summary

Source note
3 November 2026; Northstar planning workshop 60 minutes; action summary 30 minutes; both completed.
Description to adapt
Northstar planning workshop and action summary — 3 November 2026.
Quantity or billing basis
1.5 hours
Check before billing
Combine only if both entries use the same agreed rate. Otherwise show separate workshop and summary lines.

Example · Consulting · CON-02

Diagnostic work

Source note
4 November 2026; reviewed three onboarding interviews; findings memo delivered; 2.25 hours.
Description to adapt
Review of three onboarding interviews and findings memo — 4 November 2026.
Quantity or billing basis
2.25 hours
Check before billing
Omit interviewees’ names and private comments. Do not claim implementation or business results.

Example · Consulting · CON-03

Retainer period

Source note
1–7 November 2026; weekly advisory retainer; two calls and written follow-up completed; contract R-02.
Description to adapt
Advisory retainer, 1–7 November 2026: two calls and written follow-up — R-02.
Quantity or billing basis
1 weekly retainer
Check before billing
Use the agreed period fee. Check what the retainer includes before adding separate charges for the calls.

Example · Field visits · FLD-01

Inspection with separate travel

Source note
5 November 2026; job FV-17; pump inspection 75 minutes; travel 20 minutes; no repair performed.
Description to adapt
Pump inspection — job FV-17, 5 November 2026.
Quantity or billing basis
1.25 hours on site
Check before billing
Keep travel as a separate 20-minute line only if your agreement permits it. Do not describe inspection as a repair.

Example · Field visits · FLD-02

Materials separate from labour

Source note
6 November 2026; job FV-18; replaced two door handles; labour 60 minutes; receipt MAT-18 for two handles.
Description to adapt
Replacement of two door handles — job FV-18, 6 November 2026.
Quantity or billing basis
1 hour labour
Check before billing
Record the two handles separately using MAT-18 and the agreed charging basis. Do not bury material cost in labour hours.

Example · Field visits · FLD-03

Return visit pending

Source note
7 November 2026; job FV-19; leak assessment 45 minutes; replacement part ordered; return visit pending.
Description to adapt
Leak assessment — job FV-19, 7 November 2026.
Quantity or billing basis
0.75 hours
Check before billing
Bill only eligible assessment work. The repair and return visit are not completed; do not include them as delivered.

Review your line before sending

Compare the wording with your source note. Check the date, quantity and agreed billing basis. Remove any claim the records do not support.

These examples cover descriptions, not every required invoice field. Use the invoice send checklist to review the whole invoice.

Local tax requirements vary. This is a writing reference, not legal or tax advice.

Reference: Business.gov.au invoicing guidance supports describing supplied work with quantities and prices. The examples here are original.

Optionally use TimeLodge to prepare invoice descriptions from tracked hours, then review each line before sending.