Skip to content

Track and manage your time

Start and switch timers, correct your day visually, clean up gaps or fragments, and finish your weekly timesheet.

Owner Admin Project Manager Finance Admin Member

Start and switch timers, correct your day visually, clean up gaps or fragments, and finish your weekly timesheet.

Before you begin

Roles and permissions

All active roles can record their own time against projects and tasks they may use. Management roles may also see a Person selector when they can manage another member's time.

You can change or delete an entry while it is Draft and unlocked. Submitted, Approved, Invoiced, or Locked entries do not show Actions. Ask an approver to reject the period, or use your workspace's correction process, before changing locked time.

Workspace owners control Timesheet approvals in Settings > Teams. Select the Edit control for your workspace. When approvals are off, Submit for approval is hidden and Save week is the final weekly action.

Steps

1. Start with Quick start

  1. Open Dashboard or Time.
  2. In Quick start, choose Riverside Offices Concept and Concept design.
  3. Add a short note if you already know what you are working on.
  4. Select Start.

Expected result: the elapsed time starts increasing and the controls change to Pause timer, Stop timer, and Adjust timer.

Quick start ready to record time for Riverside Offices Concept and Concept design.

2. Manage the running timer

  1. Select Pause timer when work stops temporarily.
  2. Check that the timer shows PAUSED, then select Resume timer when you continue.
  3. Refresh the page if you need to recover the view. The active timer and its controls return without starting another entry.
  4. Select Switch work when you move to another project or task. Choose the new work, review both sides of the change, then select Switch work again.
  5. Check the confirmation. The first entry ends at the exact moment the next one starts, so no time is lost or counted twice.
  6. Select Adjust timer if you need to correct the current duration before saving.
  7. Select Stop timer when the work is complete.

Expected result: Stop Timer & Review Entry opens so you can review the saved duration and note.

Active timer showing pause, stop, and adjust controls for the sample project.

3. Review and save the timer

  1. In Stop Timer & Review Entry, check the duration.
  2. Add a clear note, such as Reviewed Riverside floor plans and sketched reception options for the client workshop.
  3. Select Stop & Save.
  4. Open Time and confirm the entry appears on today's daily view.

Expected result: the timer becomes a Draft entry and the daily total includes its saved duration.

Invoice the work you just recorded

After saving a stopped timer, choose Invoice now to open the invoice builder for that client and project. Existing drafts can be resumed. Work still awaiting approval must be reviewed by an authorised person before you select it.

Follow Choose work, Review invoice, and Finish. Saving creates or updates a draft; finalising and sending are separate actions. On mobile, the running timer uses a compact row while you prepare an invoice. Tap it to open the timer controls.

See Invoice your work and record a payment for the full walkthrough.

4. Add time manually

  1. On Time, use Previous day, Today, Next day, or the date field to open the correct day.
  2. Select Add manual entry.
  3. Choose Project and Task.
  4. Check Date, then enter Duration (hours) or the optional start and end times.
  5. Add Notes and optional Tags. Check Billable when the work is billable.
  6. Select Save entry.

Expected result: the entry appears as Manual and the daily summary updates. The dialog's Date follows the day selected before you opened it.

Daily view showing completed timer and manual entries with notes, tags, and totals.

5. Correct time on the day timeline

  1. Open Time and select the day you need to correct.
  2. Select Edit day. Select an entry to open its exact controls.
  3. Use Move earlier or Move later to shift the entry. Use the start and end controls when only one edge is wrong.
  4. Read the proposed range, duration, and overlap warning. Select Save change only when the preview is right.
  5. Select Undo in the confirmation if the correction was not what you intended.

Expected result: the entry moves only after confirmation. Its project, task, notes, and billable setting stay unchanged.

6. Merge fragmented entries

  1. Open Day actions and select Select entries.
  2. Select two or more draft entries for the same work. You can select them from the timeline or the exact entry list.
  3. Select Merge, then review the resulting time range and any differences.
  4. Resolve every difference shown. A real gap must be filled separately and is never counted as worked time.
  5. Select Merge entries. Use Undo if you need the original entries back.

Expected result: compatible fragments become one draft entry. Overlapping seconds count once.

7. Repair a gap or overlap

  1. Open the Day warnings panel above the timeline.
  2. Select a gap to add work for that exact range. Choose its project and task, then select Save entry.
  3. Select an overlap to see every affected entry. Choose Move entry, Change start, Change end, or Exact edit.
  4. Review the proposed correction. Nothing changes until you save it.

Expected result: the warning disappears when the saved entries no longer contain that gap or overlap.

If the day changed after you opened a warning, TimeLodge keeps your details and asks you to refresh. No saved entry changes.

8. Correct, duplicate, copy, or delete draft time

  1. Find a Draft entry on Time and select Actions.
  2. Select Edit, update the duration, Notes, or Tags, then select Save Changes.
  3. Select Duplicate when you need another draft with the same project, task, duration, and details. Edit the new entry if its work differs.
  4. To remove entries in bulk, select their checkboxes, choose Delete selected, review Preview deletion, then select Delete affected records.
  5. To reuse a prior day, choose Copy previous day. Choose Copy previous week to copy entries from the same weekday one week earlier.

Expected result: totals refresh after each saved change. Copies and duplicates remain separate Draft entries, so correct or delete any extra copy immediately.

If Actions is missing, the entry is locked or no longer Draft. Do not create a replacement to work around the restriction.

9. Pin a frequent timer

  1. In Quick start, choose the project and task you use often.
  2. Select the control labelled Pin combination.
  3. Check that Pinned: lists Riverside Offices Concept · Concept design.
  4. Select the pinned row's Start button next time. Use Unpin combination when it is no longer useful.

Expected result: the project and task stay available as a one-step timer choice.

10. Review and complete the weekly timesheet

  1. Open Timesheet.
  2. Use Previous week, This week, or Next week to choose a period. Each control moves to the adjacent or current workspace week.
  3. Review the Weekly total and each billable/non-billable daily total.
  4. Enter decimal hours in an editable daily cell, then select Save week. Use Add row if the project and task are not already listed.
  5. If a cell combines multiple entries, use Day view to correct the individual records.
  6. When approvals are enabled, select Submit for approval.
  7. If submission reports Add a note to this billable entry before submitting, choose Day view, open that date, and use Actions > Edit. Add Notes, select Save Changes, then submit again.

Expected result: a successful submission shows Submitted and These hours are locked pending review. The period's entries no longer show Actions in Day view.

Submitted weekly timesheet at narrow width showing hours locked pending review.

Expected result

Your daily view contains realistic timer and manual work for Northstar Architecture, with clear notes and accurate totals. Your weekly view preserves saved edits and, when approvals are enabled, shows the submitted period as locked pending review.

Troubleshooting

  • If Start is unavailable, confirm that you are active and assigned to the selected project and task.
  • If the timer view looks stale, refresh once. The running or paused timer should return with its current controls.
  • If a manual entry lands on the wrong day, open that day, use Actions > Edit, correct Date, and select Save Changes.
  • If Save week is disabled, no weekly cell has an unsaved change.
  • If Submit for approval is missing, the workspace does not have Timesheet approvals enabled.
  • If Actions is missing, check for Submitted, Approved, Invoiced, or Locked. An approver or authorised correction path must reopen the record.
  • If copying adds an unwanted entry, select its checkbox and use Delete selected while it remains Draft.
  • If a gap repair says the day changed, refresh Time and open the current warning again. This prevents an old suggestion from overwriting newer work.

Next, keep the submitted period ready for your workspace approver to review.